CATEGORY: Energy, Renewable Energy Sources
LOCATION: Greece
START/END: 1994-1995
CLIENT: European Commission - DG XVII
The key objectives of this assignment are to: To provide Owner’s Engineering Services to the Client regarding the construction supervision of a 45MW ...
The main objective of the present assignment is to perform a diagnostic review of the electricity sector of Sudan both from financial and operational ...
The overall objective of the project was to support Serbia in reforming its Energy Policy by meeting the EU Acquis and the upcoming obligations for ...
To better understand the potential for the penetration of biogas project, supporting the Bank in developing a systematic approach to analyse ...
The purpose of this assignment was to perform a technical review and assess viability of a proposed biomass CHP plant of 25 MWe capacity in Amyntaio, ...
The project aims at raising the awareness of EU technology manufacturers and investors on the important market potential existing in China and to ...
The specific objectives of the project are the following: Identifying the gaps and the obstacles impeding progress towards regional energy market ...
The project referred to the construction of a 24 MW wind Park in Molaoi of Lakonia, in southern Greece. Owner and future operator of the park was the ...
The project included the provision of technical assistance to the development of appropriate instruments for the definition and the subsequent ...
The main objective of this assignment is to provide technical assistance to the Goulandris Natural History Museum for Energy Efficiency and RES ...
The main objective of this project is to progress the development of Bulgaria's renewable energy sources (RES) market through the establishment of a ...
Preliminary studies (Drafting of drawings, Energy Yield Analysis, Preliminary technical study, Investment Plan, Financial Planning, Project Time ...
Feasibility study for the installation of a 1 MWe CHP plant for an installation with greenhouses utilizing as feedstock exhausted pomace. ...
The project refers to the provision of support to the client, Mirini Energy, for the licensing procedure for the issue of the installation license ...
The aim of the project is to provide assistance to EBRD on the implementation of the Georgian Energy Efficiency Programme. EBRD has established a ...
This project, under the distinctive name of PRESSEA, aimed to promote the implementation of renewable energy sources (RES) in the greater region of ...
The overall project objectives summarise as follows. The project aims: to identify barriers to the renewable energy development in China in line ...
Scope of the project is to conduct a midterm review of the Sustainable Energy Facility (SEF) of the International Finance Corporation (IFC), which is ...
The overall objective of the assignment is to assist EIB and the Municipality of Yerevan (MoY) in preparing effectively the pilot phase of an ...
The project aims at the development of a Regulatory Roadmap for the promotion of RES in Mongolia. Individual actions of the project ...
The project referred to the construction of a 5 MW wind Park in Kastri, on the southern part of Evia island, in central Greece. This area is one of ...
The project referred to energy saving interventions in two typical collective apartment block residences in the municipality of Tavros, in Athens, ...
The aim of the project was to undertake four energy audits at the buildings of NOKIA HELLAS in Athens in order to comply with the new legislative ...
The project aims to develop and test a concrete policy-oriented framework that will serve to regulate RES electricity systems regarding their ...
The overall objective of the assignment is to assist EIB and the Municipality of Chisinau (MoC) in preparing effectively the pilot phase of an ...
The overall objective of the project is to contribute to the progress of the INOGATE Partner Countries in the achievement of the Baku Initiative and ...
The main objective of this Framework Contract is to provide technical assistance in supporting resource efficiency investment projects of EBRD in its ...
The overall objective of this project is to continue the substantial improvement to the level of institutional capacity in the Energy Regulatory ...
The main objective of the final evaluation assignment is to provide an overall independent assessment of the “Project Support” 2nd complementary ...
The Consultant was engaged to provide consultancy services for the Bank with respect to due diligence services for PV plants.The ...
This project concerned consultancy services for a group of Banks & Developers with respect to the development of a 21 MW Wind Farm in the area of ...
The objective of this project was the improvement of energy efficiency by introducing new advanced technologies in the wood industry of Romania. ...
The key objectives of this assignment are to: Review the relevant existing legislation and regulations and, where necessary, recommend appropriate ...
To assist the Projects Directorate, in particular the Energy Department, in technical, economic, financial, procurement, environmental and social ...
The purpose of this assignment is to perform the necessary technical due diligence and project construction monitoring services on behalf of the Bank ...
LDK implements a technical assistance project for private customer regarding the development of PV project pipeline. The assignment involves ...
This project is being implemented by LDK Consultants and refers to the performance of due diligence and construction monitoring services for a 10MW ...
The main aim of this project was to provide the Ministry of Infrastructure of Mongolia with defined and variable renewable energy pilot projects and ...
Business Reg No.: 324501000