News


CATEGORY: Engineering & project management, Hospitals & Health Facilities
LOCATION: Greece
START/END: 2003 - 2008
CLIENT: Erasinio Hospital S.A.
ORIGIN OF FUNDING: Erasinio Hospital S.A.
PROJECT VALUE: MEP:15,000,000
LDK’s BUDGET SHARE: 100%
STAFF PROVIDED: 14

Type of Services
The scope of work included Preliminary Design, Design Development, Final Design of the following installations:
Water Supply / Sewage / Storm Drainage / Fire Fighting / Heating, Ventilation and Air Conditioning / Lighting/ Electrical Power / Electrical Substation / Emergency Generator, UPS / Telephones – Data / Sound Facilities / Lightning Protection and Earthing / Lifts / Special installation networks (compressed air, vacuum system, medical gases, steam network etc.) / Natural Gas / LPG
Description
Erasinio Hospital Centre of Excellence in Oncology at Koropi, Athens, Greece specialized in diagnosis and treatment of neoplasmatic diseases, with a potential of 224 beds (45,180 m² main spaces, 12,190 m² support facilities and 50,000 m² surroundings).
The hospital services include amongst others nursing units of 171 beds, an Intensive care unit of 8 beds, increased care units of 12 beds, 10 septic surgery chambers, 9 non-septic surgery halls, a radiotherapy unit including two linear accelerator units, chemotherapy unit of 5 application chambers and 9 therapy chambers, a 12 bed artificial kidney unit, a 2 bed lithotripsy unit, hemodynamics unit of 6 single bed chambers, nuclear medicine unit, iodine therapy unit of 4 single bed chambers, central sterilization.