CATEGORY: Engineering & project management, Hotels & Resorts
LOCATION: Athens, Greece
START/END: 2015 - 2018
CLIENT: Astir Palace Vouliagmenis AXE
ORIGIN OF FUNDING: Jermyn Street Real Estate Fund IVLP
PROJECT VALUE: MEP: 20,000,000
LDK’s BUDGET SHARE: 100%
STAFF PROVIDED: 18

Type of Services
The scope of work of the buildings includes Due Diligence, Preliminary Design, Design Development, Final Design and Site Supervision of the following installations:
Water supply / Sewage / Storm Drainage / Fire Fighting / Heating, Ventilation and Air Conditioning / Lighting / Electrical Power / Electrical Substation / Emergency Generator, UPS / Public Address / Building Management System / Lightning Protection & Earthing / Lifts / Fire Detection / Natural gas
The scope of work of the infrastructure networks includes the Preliminary Design, Design Development, Final Design of the following installations:
Medium Voltage / Power Substations / Water Supply Networks / Pumping Stations / Water Distribution / Sewerage and Drainage Networks / Fire Fighting Systems / Seawater Pumping Networks / Gas
Description
The Four Seasons Astir Palace, located along the Athenian Riviera is the first Four Seasons hotel in Greece.
The project entails the full refurbishment and comprises the following:
- Arion Hotel: 15,500 m² (106 keys including 21 suites)
- Nafsika Hotel: 23,000 m² (136 keys including 22 suites)
- New SPA: 1,300 m²
- Administration Building
- Sports facilities (Tennis, Basketball, Football, etc.)
- New Main Entrances (Guard / Gatehouses)
- New outdoor Restaurant and Pool Bar
- Full refurbishment of the outdoor areas with new swimming pools and water features: 300,000 m²
The goals of the design were the elegant luxury of the premises and top satisfaction of guests with high-end technology In addition, sustainability measures such as solar water heating, grey waste treatment and reuse and energy saving were also top priorities.