Energy Efficiency (EE) and Thermal Building Refurbishment Project in Yerevan, Armenia
Energy Efficiency (EE) and Thermal Building Refurbishment Project in Yerevan, Armenia

CATEGORY: Energy, Investments, Renewable Energy Sources, Rational Use of Energy, Socioeconomic development, Public Administration

LOCATION: Yerevan, Armenia

START/END: 2016 - 2019

CLIENT: European Investment Bank (EIB)

ORIGIN OF FUNDING: European Investment Bank (EIB)

PARTNERS: Centre for Renewable and Energy Saving (CRES), GR

PROJECT VALUE: 299,600

LDK’s BUDGET SHARE: 95

STAFF PROVIDED: 5

Energy Efficiency (EE) and Thermal Building Refurbishment Project in Yerevan, Armenia

Type of Services

LDK is providing assistance via:

  • finalisation of a project’s proposal based on preliminary agreements between the Municipality and the EIB.
  • provision of TA to the Municipality of Yerevan and EIB in defining/preparing the project (pilot phase).

More specifically within the following components:

  • Feasibility study aiming to propose a Municipal strategy on Energy Efficiency investment in the city of Yerevan and providing all required input for the implementation of this strategy as well as a pilot investment plan. Actions include:
  • Assessment of data and site visits
  • Selection of a priority lists of buildings to be refurbished
  • Setting up forms and standards for energy audits and energy performance certificates
  • Performance of 3-5 pilot energy audits at municipal buildings (schools, kindergartens, hospitals);
  • Determination of technical scope of works including EE measures for the refurbishment of the building shell as well as horizontal EE measures (lighting, solar, improvement of heat generation-distribution systems etc.)
  • Survey on structural conditions of the buildings and assessment of needed interventions in term of seismic safety and accessibility for disabled persons
  • Selection of optimal mix of buildings to be rehabilitated
  • Set-up a pay-back mechanism for the residential sector and risks mitigation measures;
      
  • Procurement support
  • Development of procurement arrangements to implement the proposed Energy Efficiency projects;
  • Assistance in preparation of tender documents and technical specifications for services and works’ contracts.    

 

  • Project implementation Manual
  • Development of a practical Project Implementation Manual;
  • Assistance in set up and functioning of a project management unit.

  • Implementation support
  • Follow up and propose the required improvements, adaptations of programmes/ procedures/strategy during the initial implementation phase (12 months) of the EE projects.
  • Building the technical capacity, awareness and standards relative to energy efficiency issues in public buildings sector amongst the local stakeholders and within the Municipality.

Description

The overall objective of the assignment is to assist EIB and the Municipality of Yerevan  (MoY) in preparing effectively the pilot phase of an ambitious multi-donor funded programme for the rehabilitation of buildings in Yerevan which at the first stage (16 MEUR), will focus on public buildings EE measures especially on thermal refurbishment.

The specific objectives of the assignment are:

  • To increase the technical capacity, awareness and standards related to energy efficiency issues in the Municipality and in public buildings sector in general amongst the Armenian stakeholders;
  • To carry pilot energy audits for selected public buildings and facilities. These energy audits will be used to prepare the procurement of future energy audits needed to define the precise scope of further refurbishment/EE works.
  • To establish a feasible pilot investment programme, identifying and prioritising investment measures in compliance with applicable technical specifications and standards and define the implementation framework;
  • To set-up a pay-back mechanism for the residential sector as well as the relevant measures to mitigate the main risks identified in this sector;

ldk.gr - Bottom info

ldk.gr - Home Section

lines green

Energy

PROJECTS

Construction Supervision and Technical Assistance for the Construction of a 45MW Wind Farm, Greece

Construction Supervision and Technical Assistance for the Construction of a 45MW Wind Farm, Greece

The key objectives of this assignment are to: To provide Owner’s Engineering Services to the Client regarding the construction supervision of a 45MW ...

CDM implementation: EU-China partnership, China

CDM implementation: EU-China partnership, China

The overall project objectives summarise as follows. The project aims: to identify barriers to the renewable energy development in China in line ...

Development of Energy Planning Capacity, Serbia

Development of Energy Planning Capacity, Serbia

The overall objective of the project was to support Serbia in reforming its Energy Policy by meeting the EU Acquis and the upcoming obligations for ...

Technical Assistance for the licensing and installation of 9 PV plants with installed capacity 27.5 MW, Greece

Technical Assistance for the licensing and installation of 9 PV plants with installed capacity 27.5 MW, Greece

LDK implements a technical assistance project for private customer regarding the development of PV project pipeline. The assignment involves ...

IFC's Sustainable Energy Facility: Midterm Evaluation, Brazil, Nicaragua & Honduras

IFC's Sustainable Energy Facility: Midterm Evaluation, Brazil, Nicaragua & Honduras

Scope of the project is to conduct a midterm review of the Sustainable Energy Facility (SEF) of the International Finance Corporation (IFC), which is ...

Support to Energy Market Integration and Sustainable Energy in the NIS (SEMISE), NIS Countries

Support to Energy Market Integration and Sustainable Energy in the NIS (SEMISE), NIS Countries

The specific objectives of the project are the following: Identifying the gaps and the obstacles impeding progress towards regional energy market ...

5 MW Wind Park in Kastri Evia - Greece

5 MW Wind Park in Kastri Evia - Greece

The project referred to the construction of a 5 MW wind Park in Kastri, on the southern part of Evia island, in central Greece. This area is one of ...

Public housing retrofits with the integration of solar techniques in the Municipality of Tavros - Greece

Public housing retrofits with the integration of solar techniques in the Municipality of Tavros - Greece

The project referred to energy saving interventions in two typical collective apartment block residences in the municipality of Tavros, in Athens, ...

Solar PV power plant: Licensing procedure support, Greece

Solar PV power plant: Licensing procedure support, Greece

The project refers to the provision of support to the client, Mirini Energy, for the licensing procedure for the issue of the installation license ...

Grid-connected 21 MW wind park, Greece

Grid-connected 21 MW wind park, Greece

This project concerned consultancy services for a group of Banks & Developers with respect to the development of a 21 MW Wind Farm in the area of ...

EU- China Liaoning Integrated Environmental Programme (LIEP) - Lot E: Energy management, China

EU- China Liaoning Integrated Environmental Programme (LIEP) - Lot E: Energy management, China

The project included the provision of technical assistance to the development of appropriate instruments for the definition and the subsequent ...

Sudan Electricity Sector Diagnostic Review

Sudan Electricity Sector Diagnostic Review

The main objective of the present assignment is to perform a diagnostic review of the electricity sector of Sudan both from financial and operational ...

Regional: Energy and Resource Efficiency Programme for the Corporate Sector (Framework Contract)

Regional: Energy and Resource Efficiency Programme for the Corporate Sector (Framework Contract)

The main objective of this Framework Contract is to provide technical assistance in supporting resource efficiency investment projects of EBRD in its ...

Renewable energy sources (RES) acceptability for energy production in the wood industry, Romania

Renewable energy sources (RES) acceptability for energy production in the wood industry, Romania

 The objective of this project was the improvement of energy efficiency by introducing new advanced technologies in the wood industry of Romania. ...

Green Economy Project Preparation and Implementation Framework – Greece: Technical Review and Project Preparation for a Biomass Combined Heat and Power (CHP) Plant

Green Economy Project Preparation and Implementation Framework – Greece: Technical Review and Project Preparation for a Biomass Combined Heat and Power (CHP) Plant

The purpose of this assignment was to perform a technical review and assess viability of a proposed biomass CHP plant of 25 MWe capacity in Amyntaio, ...

Energy Efficiency (EE) and Thermal Building Refurbishment Project in Yerevan, Armenia

Energy Efficiency (EE) and Thermal Building Refurbishment Project in Yerevan, Armenia

The overall objective of the assignment is to assist EIB and the Municipality of Yerevan  (MoY) in preparing effectively the pilot phase of an ...

Final evaluation of the "Renewable Energy and Energy Efficiency Programme in Jordan REEE I"

Final evaluation of the "Renewable Energy and Energy Efficiency Programme in Jordan REEE I"

The main objective of the final evaluation assignment is to provide an overall independent assessment of the “Project Support” 2nd complementary ...

Due Diligence and Bank’s engineer services for a cluster of 18 PV projects. Total installed capacity of 8.69MWp, Greece

Due Diligence and Bank’s engineer services for a cluster of 18 PV projects. Total installed capacity of 8.69MWp, Greece

    The Consultant was engaged to provide consultancy services for the Bank with respect to due diligence services for PV plants.The ...

Promotion of Renewable Energy Sources in South East Asia (Pressea 1-2) – Thailand, Malaysia, Indonesia, Philippines

Promotion of Renewable Energy Sources in South East Asia (Pressea 1-2) – Thailand, Malaysia, Indonesia, Philippines

This project, under the distinctive name of PRESSEA, aimed to promote the implementation of renewable energy sources (RES) in the greater region of ...

Support for Competitive Procurement of Renewables in Moldova

Support for Competitive Procurement of Renewables in Moldova

The key objectives of this assignment are to: Review the relevant existing legislation and regulations and, where necessary, recommend appropriate ...

Georgian Energy Efficiency Programme, Georgia

Georgian Energy Efficiency Programme, Georgia

The aim of the project is to provide assistance to EBRD on the implementation of the Georgian Energy Efficiency Programme. EBRD has established a ...

CYPV Solar Photovoltaic Project - Technical Due Diligence and Construction Monitoring for five solar PV parks of total capacity 11.9 MW, Cyprus

CYPV Solar Photovoltaic Project - Technical Due Diligence and Construction Monitoring for five solar PV parks of total capacity 11.9 MW, Cyprus

The purpose of this assignment is to perform the necessary technical due diligence and project construction monitoring services on behalf of the Bank ...

24 MW Wind Park in Molaoi–Lakonia - Greece

24 MW Wind Park in Molaoi–Lakonia - Greece

The project referred to the construction of a 24 MW wind Park in Molaoi of Lakonia, in southern Greece. Owner and future operator of the park was the ...

Assistance to the Energy Regulatory Office, UNM in Kosovo

Assistance to the Energy Regulatory Office, UNM in Kosovo

The overall objective of this project is to continue the substantial improvement to the level of institutional capacity in the Energy Regulatory ...

Framework to regulate the operation and planning of medium size electricity grids combining renewable energy sources and conventional systems – EU countries

Framework to regulate the operation and planning of medium size electricity grids combining renewable energy sources and conventional systems – EU countries

The project aims to develop and test a concrete policy-oriented framework that will serve to regulate RES electricity systems regarding their ...

Feasibility study for 6 MWth (1MWe) biomass CHP plant, Greece

Feasibility study for 6 MWth (1MWe) biomass CHP plant, Greece

  Feasibility study for the installation of a 1 MWe CHP plant for an installation with greenhouses utilizing as feedstock exhausted pomace. ...

Assessment of the potential to establish joint ventures between China and EU for small hydropower plants, China

Assessment of the potential to establish joint ventures between China and EU for small hydropower plants, China

The project aims at raising the awareness of EU technology manufacturers and investors on the important market potential existing in China and to ...

Energy Efficiency for the Corporate Sector (FC), Biogas Technologies and Market Potential in EBRD's Countries of Operation

Energy Efficiency for the Corporate Sector (FC), Biogas Technologies and Market Potential in EBRD's Countries of Operation

  To better understand the potential for the penetration of biogas project, supporting the Bank in developing a systematic approach to analyse ...

Goulandris Natural History Museum – Energy intelligent thematic museums of near-zero energy consumption, Greece

Goulandris Natural History Museum – Energy intelligent thematic museums of near-zero energy consumption, Greece

The main objective of this assignment is to provide technical assistance to the Goulandris Natural History Museum for Energy Efficiency and RES ...

Lender’s Engineer Services for a 10 MW Wind farm in Cyprus

Lender’s Engineer Services for a 10 MW Wind farm in Cyprus

This project is being implemented by LDK Consultants and refers to the performance of due diligence and construction monitoring services for a 10MW ...

Regulatory capacity building for renewable energy sources, Bulgaria

Regulatory capacity building for renewable energy sources, Bulgaria

The main objective of this project is to progress the development of Bulgaria's renewable energy sources (RES) market through the establishment of a ...

Energy Audits at the buildings of NOKIA HELLAS, Greece

Energy Audits at the buildings of NOKIA HELLAS, Greece

The aim of the project was to undertake four energy audits at the buildings of NOKIA HELLAS in Athens in order to comply with the new legislative ...

INOGATE Technical Secretariat and Integrated Programme in support of the Baku Initiative and the Eastern Partnership energy objectives, NIS Countries

INOGATE Technical Secretariat and Integrated Programme in support of the Baku Initiative and the Eastern Partnership energy objectives, NIS Countries

The overall objective of the project is to contribute to the progress of the INOGATE Partner Countries in the achievement of the Baku Initiative and ...

Mongolia: Renewable Energy Regulatory Roadmap

Mongolia: Renewable Energy Regulatory Roadmap

    The project aims at the development of a Regulatory Roadmap for the promotion of RES in Mongolia. Individual actions of the project ...

Energy Efficiency (EE) and Thermal Building Refurbishment Project in Chisinau, Moldova

Energy Efficiency (EE) and Thermal Building Refurbishment Project in Chisinau, Moldova

The overall objective of the assignment is to assist EIB and the Municipality of Chisinau (MoC) in preparing effectively the pilot phase of an ...

Licensing of the 7.99 MW Solar power station at the National and Kapodistrian University of Athens

Licensing of the 7.99 MW Solar power station at the National and Kapodistrian University of Athens

Preliminary studies (Drafting of drawings, Energy Yield Analysis, Preliminary technical study, Investment Plan, Financial Planning, Project Time ...

sector inner module transport bg min