CATEGORY: Transport infrastructure, Urban Transport
LOCATION: Location
START/END: 2010 - 2011
CLIENT: TRAM S.A.
ORIGIN OF FUNDING: TRAM S.A.
PARTNERS: NAMA S.A., ANTEM LTD
PROJECT VALUE: 200.000
LDK’s BUDGET SHARE: 40%
STAFF PROVIDED: 2

Type of Services
- Traction Power Simulation
- Design of Traction Power Substations
- 750 V DC Overhead Contact Line (OCL)
- Electromagnetic compatibility study
- Computations of masts, portals and foundations
- Electrical feeding and sectioning design
- E & M equipment of stops
- Stray currents study
Description
Preliminary design for Extension of Tram to Argyroypolis
Design of the trajectory together with traffic considerations to meet the new functional demands of TRAM S.A. Total length of double track is 2.0 km
Traction Power simulation to determine the need of additional substations, design of the Overhead Contact Line System and design the substations.
Design of halts along the route, and terminal halt at Argyroupolis.