News


CATEGORY: Engineering & project management, Infrastructure
LOCATION: Attica Region
START/END: 2018
CLIENT: LAMDA DEVELOPMENT S.A.
ORIGIN OF FUNDING: GLOBAL INVESTMENT GROUP
PARTNERS: TEKEM S.A.
LDK’s BUDGET SHARE: 50%
STAFF PROVIDED: 7

Type of Services
The scope of work for the MEP Utilities Infrastructure design includes the following installations:
Rainwater Drainage / Trachones & Airport Water Streams / Sewage / Wastewater Management / Wastewater Treatment / Water Supply / Irrigation & Water Features / Fire Suppression / Power Supply / Lighting / Telecommunications / Natural Gas / Solid Waste Management (SWM) / Smart City Systems
Description
The project entails the execution of the Preliminary Design for the MEP infrastructure of the Metropolitan Hellinikon – Agios Kosmas Development. The Preliminary Design includes:
- the relevant Technical Reports, Drawings, Diagrams, etc.
- all designs, technical reports, etc. related to the MEP infrastructure that must be integrated to the Environmental Impact Assessment of the project
- contacting the relevant Utilities for the determination of the required specifications and special requirements for the Utility Networks related to the project