ldk.gr - Header Section

ldk.gr - Main Section

News

Interconnection between control centres of Greece and Bulgaria
Interconnection between control centres of Greece and Bulgaria

CATEGORY: Energy, Transmission & Distribution Networks

LOCATION: Greece

START/END: 1997-1998

CONSULTANCY BUDGET: 195,000 €

CLIENT: PPC (GR)

PARTNERS: KEMA (NL)

LDK’s BUDGET SHARE: 25%

STAFF PROVIDED: 3

Interconnection between control centres of Greece and Bulgaria

Type of Services

Within the frame of this project LDK was responsible for:

  • the conjunction and examination of all existing reports, studies, documentation and available data related to the relevant control centres;
  • the conjunction and study of all existing reports, studies, documentation and available data related to the joint coordination procedures between Greece and Bulgaria.

 

Description

The Global objective of the project was the elaboration of a feasibility study on the interconnection procedures between the national control centres of Greece and Bulgaria. The study also specified the necessary infrastructure in terms of hardware and software for the modernisation of the two control centres.