News


CATEGORY: Energy, Investments, Markets
LOCATION: Greece
START/END: 1996-1998
CLIENT: European Commission - DG XVII
ORIGIN OF FUNDING: ALTENER

The overall objective of the current EPTATIF TA assignment is to assist EIB and the Municipalities of Chisinau (MoC) and Yerevan (MoY) respectively ...
The main objective of the assignment the assessment and update of the Capital Investment plan for the EE renovations and internal rehabilitation of ...
...
The overall objective of the project is to contribute to the progress of the INOGATE Partner Countries in the achievement of the Baku Initiative and ...
The specific objectives of the project are the following: Identifying the gaps and the obstacles impeding progress towards regional energy market ...
The aim of this project was the dissemination of information in Romania and Bulgaria, concerning modern and efficient EU technologies for industry, ...
The overall objective of this project was to facilitate and increase trade and investment flows in the rehabilitation of existing and development of ...
To better understand the potential for the penetration of biogas project, supporting the Bank in developing a systematic approach to analyse ...
This project refers to the elaboration of a feasibility study for the rehabilitation of the energy system for the Clinical Centre of Nis, Serbia. The ...
The project referred to the provision of support and assistance to IBERDROLA GENERACION SAU for the preparation of all legal documentation for ...
The aim of the project is to provide assistance to EBRD on the implementation of the Georgian Energy Efficiency Programme. EBRD has established a ...
The main objective of the project was to develop an intelligent Building Management System (BMS), based on existing BMS and networking technology ...
The overall objective of the assignment is to assist EIB and the Municipality of Chisinau (MoC) in preparing effectively the pilot phase of an ...
The main objective of this Framework Contract is to provide technical assistance in supporting energy efficiency investment projects of EBRD in its ...
The overall objective of the assignment is to assist EIB and the Municipality of Yerevan (MoY) in preparing effectively the pilot phase of an ...
Detailed description of project The project concerned the provision of advisory services aiming at accelerating private sector participation in ...
The purpose of this project is to provide technical assistance for capacity building to the Albanian Administration to: advance the investment ...
The project aimed to foster economic growth in South-eastern Europe by improving the management, delivery and rational use of electricity in the ...
The project referred to the construction of a 5 MW wind Park in Kastri, on the southern part of Evia island, in central Greece. This area is one of ...
The project referred to the construction of a 24 MW wind Park in Molaoi of Lakonia, in southern Greece. Owner and future operator of the park was the ...
This project referred to a pilot action aiming to evaluate the opportunity for the implementation of the schemes that facilitate the establishment of ...
The objectives of the project were to: promote efficiency and energy saving measures in the industry and households; promote and support local ...
The project referred to the study of performance of market studies for Bulgaria and Romania, analysing specific areas of the power sector in each ...
Business Reg No.: 324501000
Copyright LDK 2018 – 2022 © All Rights Reserved