News


CATEGORY: Engineering & project management, Housing & Residential Facilities
LOCATION: Ghana
START/END: 2012 - 2017
CLIENT: Regimanuel Gray Limited
ORIGIN OF FUNDING: Regimanuel Gray limited
PROJECT VALUE: MEP: 63,000,000
LDK’s BUDGET SHARE: 100%
STAFF PROVIDED: 9

Type of Services
- The scope of work of MEP installations for buildings includes Construction Design, Shop Drawings and Site Supervision of the following installations: Electrical & LV Systems (Power, Telephones - Data, TV-Radio, Lightning protection, Video intercom) / Lifts / LPG / Public Services (Water Supply, Irrigation, Sewage) / Fire Fighting and Fire Detection / HVAC Systems
- The scope of work of MEP installations for Infrastructure networks includes Preliminary Design, Detailed Design, Site Supervision of the following installations: Sewage piping / Water supply piping with water tanks and pressure system / LPG distribution / Electrical power (medium voltage and low voltage networks, substations, generators, earthing) / Telecommunications / Street and parking lighting
- Scope of work for Sewage Treatment Plant includes Preliminary Design, Detailed Design, Site Supervision. Estimations of flows and loads based on the population served (10,000 PE)
Description
Residential Development located in Klagon – Tema, Ghana on Plot No AR/1897/2011.The developmenthas the following characteristics:
- 81 apartment buildings with 4 and 6 floors per building and 4 apartments per floor
- parking areas
- play areas for children
- gatehouses for each neigh- bourhood.
Total area of the development is 350.000 sq.m.